After calculating amount of FM-200 gas needed to protect the area, appropriate cylinder is selected. Discharge nozzles are installed in the area that is equipped with cross-zone detection system. Upon activation of smoke detectors, an electrical signal is transmitted from the panel to FM-200 system solenoid valve and all FM-200 is discharged in maximum 10 seconds. |